Below is our Non
Distrucktion Test (NDT) project information have been perform
: |
|
 |
 |
|
|
U/W Measurement SBM Mooring Chain UT & MPI
at SBM PERTAMINA, June 09 |
| |
On June 2009, Aquamarine
team had done measure at SBM PERTAMINA. Observed visual
and recorded by U/W CCTV for Ultrasonic Thickness in
morning area, Magnetic Particle connecting chain,Measurement
angle and diameter chain, Thick marine growth, and corrotion
meter of cathodic protection. This inspection have been
attended by BKI surveyor, Representative Owner, Ship
Captain and also Aquamarine team. This job has done
successfully.
|
NDT UT & LOAD TEST Inspection at FSO. CINTA
NATOMAS, August 2009 |
| |
On August 2009, Aquamarine team has
done measure at FSO. CINTA NATOMAS, observed by Ultrasonic
panametric as a follow special survey SS-7 and RON 2000
Load Test.This inspection have been attended by American
Bureau of Shipping (ABS) Surveyor, Representative Owner,
Ship Captain and also Aquamarine team. and this job
have done successfully.
|
|
| |
MT. Patriot Ceria, March 10 |
|
OSB Cilacap, April10 |
TB.
Hima, March10 |
|
Drilling saipem , April 10 |
BG. Intan Kelana VI, April 10 |
|
Ocean Sovereign, May10 |
|
 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|